Industry news|2022-02-28| admin
The main components of the plum blossom elastic coupling are the shaft sleeves at both ends and the elastic body in the middle. The elastic coupling can transmit torque with zero backlash and no vibration. Backlash can be eliminated with elastomers. Some problems will also be encountered in the application of elastic couplings. Today, I will introduce to you how to install elastic couplings during use and what to pay attention to.
1. Before installation, first check whether the two shafts of the prime mover and the working machine are concentric, whether there is wrapping paper and collision on the surfaces of the two shafts, whether there are debris in the inner holes of the two half couplings of the plum coupling, and whether there is collision at the edge of the inner hole . If so, clean the shaft and coupling halves and use a fine file to handle the bumps. Then check whether the diameter and length of the inner hole of the two half couplings are consistent with the diameter and length of the shaft extension of the prime mover and the working machine. In general selection, it is better to let the length of the half coupling at the end of the prime mover and the working machine be less than the length of its shaft extension by 10-30mm.
2. In order to facilitate installation, it is best to put the two half couplings into a 120-150 incubator or oil tank for preheating, so that the size of the inner hole is increased and it is easy to install. After installation, make sure that the shaft head cannot protrude from the end face of the half coupling, preferably flush. Detect the distance between the two half couplings: measure the readings of 3-4 points along both sides of the half coupling flange, as well as the sum of the measured dimensions of the extension section and the two membrane groups, and the error is controlled in the range of 0-0.4mm Inside.
3. Correction: use a dial indicator to detect the runout of the flange end face and outer circle of the two halves of the coupling. When the outer circle of the flange is less than 250mm, the runout value shall not be greater than 0.05mm; when the outer circle of the flange is greater than 250mm, the runout value shall not be greater than 0.08.
4. Install bolts: Insert the bolts from the outside of the small hole of the flange, and pass through the outside of the large hole of the other flange. Put on the buffer sleeve, elastic washer, twist the nut, and tighten the nut with a wrench. If the installation is uncomfortable or disassembled for replacement, the shaft and half-coupling will not be damaged, and it is best to rotate freely after installation.
5. Operation instructions: Before starting the equipment, check whether the nut of the plum coupling is loose or falls off. If so, tighten the nut with a wrench in time.
The installation process of the plum blossom coupling does not require too many preparations. The main thing is to do the preparatory work before installation, grasp the details of the installation well, and do the debugging work well. More is still a matter of details, so try not to install it before the preparations are done. For more questions, you can consult Shenzhen Weidong.
| 日本一级A片BBBBBB视频 | EEUSS秋霞鲁丝片无码 | 丰满岳乱妇道伦91麻豆 | 无码人妻一级毛片免费影院嫩草 | 亚洲另类偷窥精品熟女少妇AV | AV无码秘蜜桃成人片玉蝶直播 | 中文字幕一级A片高清免蜜臀 | 久久久精品A片免费观看农村妇女 | 亚洲最新国语黄色网址 | 午夜精品一区二区在线观看的 | www久久久红桃视频国产 | 色狠狠一区二区三区香蕉 | 寡妇高潮一级毛片免费看软件下载 | 911精品人妻少妇无码 | 国产又黑又硬又爽的视频 | 51精产国品久久一二三A区蜜桃 | 91丨欧美熟妇在线 | 中文字幕一区二区三区在线观看 | 亚洲日本苍井空精品偷拍无码制服 | 国产精品扒开腿爽爽爽的视频动漫 | 欧美性一交一乱一交A片视频 | 波多野结衣暴风雨一区二区 | 人妻无码HEYZO少妇精品 | 少妇性BBB搡BBB爽爽爽作文 | 久久精品国产77777蜜臀 | 国产av一区二区。 | 97精品人妻无码专区在线视频 | silk av在线观看 | 免费黃色三級片在线观看 | 国产一级婬片A片免费无成人黑豆 | 国产成人无码A片V99 | 青娱国产盛宴极品视频观看 | 一级A片人妻少妇免费看 | 肥婆老熟女一区二区三区四区 | 久久精品国产AV一区二区三区 | 国产视频高清无码在线观看 | 四房色播五月天激情电影 | 在线视频福利你懂的 | 日本午夜理论片手机在线电影 | 亚洲AV无码乱码在线观看 |